Automatic Transfer Switch Installation Services in Pinecrest, FL

The transfer switch is the part that watches the grid, starts the generator and moves your home onto backup power, all in seconds.

The switch that does the thinking

We install service-rated and load-managed switches, including setups that shed heavy loads such as a second air conditioner when the generator is near its limit. A good switch install keeps the changeover safe and keeps the generator from overloading.

Most jobs run about 6 to 10 weeks from the first site visit to a tested system. The on-site work takes a day or two; the permits take the longest.

  • Service-rated and load-managed switches
  • Safe automatic changeover in seconds
  • Load shedding for heavy appliances
  • Existing switch upgrades and replacements

Standby Generators Pinecrest Is Proud to Serve Florida

Why Choose Us for Automatic Transfer Switch Installation?

Service-rated and load-managed

We install service-rated and load-managed switches matched to your generator and your panel.

Changeover in seconds

The switch watches the grid, starts the generator and moves your home onto backup power in seconds — and switches back when utility power returns.

Load shedding for heavy appliances

When the generator is near its limit, the switch sheds heavy loads such as a second air conditioner, so the unit never overloads.

Upgrades and replacements

We upgrade and replace existing transfer switches, including switches on generators we did not install.

Contact Us Today for a Free Estimate

Call 786-589-9026 or request a free estimate. No obligation.

Call 786-589-9026

Free — no obligations